Loading... This could take up to a few minutes.
Please do not refresh or leave the page

Environmental Munitions Center of Expertise Review Request

Basic Document Info

*
*
*

Primary POC
*
*
*
*
Secondary POC




Add Supplementary POCs (Max 2)
Supplementary POC 1




Supplementary POC 2




Remove Supplementary POCs

Project/Program*

? Select if you are submitting a document related to a Formerly Used Defense Site. This includes projects that are FUDS and have PFAS.
? Select if you are submitting a document for a PFAS review (per the DTO) for any program other than FUDS.
? Select if you are submitting a document for review for any program other than FUDS and does not involve PFAS
*
*
*

* Select all that apply. Generally Project #00 Applies to Property-Level Documents
*
*
*
*
*
*
* The District PDT has conducted a QC review of the document submitted. At least one POC must be filled out to submit form.
*
? All USACE elements engaged in FUDS program are mandated to use FUDSCHEM for all projects with chemical contaminants of concern (CoCs) and sampling requirements in RA-O/LTM phases scheduled or active for 10 years or more and all projects sampling emerging or high profile contaminants per Handbook Table K-4 “FUDS Emerging and High Profile Contaminants List”.
If the project involves chemical COCs and/or sampling requirements, is FUDSCHEM being used as required by the FUDS Handbook?
*
Select all special designations that apply. You must make at least one selection.
? No special designation
? Review is related to the FUDS Completeness Audit
? Review does not require ITR by policy
? Review is for an EPIC groundwater project
? Review is for a FUDS Goal 1 project
? Review is for a FUDS Goal 2 project
? Review involves PFAS for a FUDS
? Review is for a Property on the FUDS “Top 10” List
? A user defined special designation (must specify)

Please Specify Other*
*
*
*
*

*

?

Reviews require project funding for non-FUDS PFAS ITRs. Org codes and associated disciplines are below (* shows the minimum that must be set up). If your document involves engineering aspects, an engineering labor code is also required. Enter labor codes below. Documents cannot be submitted until required fields are entered.
Financial PA: Amanda Odem
Amanda.L.Odem@usace.army.mil
Technical Lead: Alison Suess
Alison.M.Suess@usace.army.mil
Financial PM: Adam Plack
Adam.R.Plack@usace.army.mil
*
*
*
*

*


Please contact the Program Point of Contact (see listed below), to determine if cross labor codes will be required for document review. Reviews will not be conducted for those that are required until cross labor codes are generated and provided to the Program Point of Contact. Technical Lead: Alison Suess - Alison.M.Suess@usace.army.mil

BRAC Review: Adam Plack - Adam.R.Plack@usace.army.mil

Army IRP Review: Heidi Durako - Heidi.L.Durako@usace.army.mil

Civil Works Review: Leslie Martinez - Leslie.G.Martinez@usace.army.mil

DNPPP Review: Mark Meacham - Mark.R.Meacham@usace.army.mil

FUSRAP and EPA Review: Mark Meacham - Mark.R.Meacham@usace.army.mil

Other: Noel Bartmess - htrw-cx.documentation@usace.army.mil



Please provide any special instructions/requests. Indicate that you have coordinated with the ITR LEAD if you require an expedited review, to include the date requested.